How we work

Eight stages, from the first visit to a year after you move in.

Every project follows the same path, the one most UK architects use. You can stop after any stage, and you only pay for the stages we’ve done.

A white card model of a house with a glazed end

Stage

Stage

What happens

What you get

What you get

0

0

Week 1

First visit

We come to the house, walk round with you, look at the planning history and talk through what you want and what you’d like to spend.

You get

A fee letter and a list of the surveys you’ll need

0

Week 1

First visit

We come to the house, walk round with you, look at the planning history and talk through what you want and what you’d like to spend.

You get

A fee letter and a list of the surveys you’ll need

1

1

Weeks 1 to 3

Brief and survey

We measure the house and the garden, write the brief down with you and agree a realistic budget for the build.

You get

You get

Measured drawings and a written brief

2

2

Weeks 3 to 8

Concept design

Two or three ideas, as sketches and simple card models, so you can see the choices before we pick one together.

You get

You get

Sketch options and a cost check

3

3

Weeks 8 to 20

Design and planning

We develop the chosen scheme, take pre-application advice if it’s worth it and make the planning application.

You get

You get

Planning drawings, statements and the decision

4

4

4 to 8 weeks

Technical design

Construction drawings with the structural engineer, the building regulations application and a written specification.

You get

You get

A package builders can price from

5

5

4 to 6 weeks

Choosing a builder

We send the drawings to up to three builders, compare the prices like for like and help you sign a standard building contract.

You get

You get

A tender report and a signed contract

6

6

For the build

On site

We visit every fortnight, answer the builder’s questions, check the work and agree each payment before you make it.

You get

You get

Site notes, valuations and instructions

7

7

Up to 12 months after

Handover

We list the snags, agree the final account and come back after a year to check anything that’s shown up since.

You get

You get

A finished house and the paperwork for it

The timber frame of a new house against a blue sky

Highfield, Sallow Edge. Stage 6, the timber frame going up.

Highfield, Sallow Edge. Stage 6, the timber frame going up.

Site visits every fortnight

Planning permission

What people ask us about planning.

General guidance for England. Every site is different, so treat this as a starting point and ask us about yours.

Q.01

Q.01

Do I need planning permission for an extension?

Not always. Many single-storey rear extensions are permitted development, within limits on depth, height and materials. Those rights are narrower for flats, listed buildings and homes in conservation areas. We’ll tell you at the first visit, and we can apply for a lawful development certificate so you have it in writing.

Q.02

Q.02

How long does planning take?

Councils aim to decide householder applications within eight weeks of validating them, and validation can take a week or two. For most extensions, allow three months from submitting the application. New homes and larger schemes can take longer.

Q.03

Q.03

What if my house is listed?

You’ll need listed building consent for any work that affects its character, inside or out, even if planning permission isn’t needed. Doing that work without consent is a criminal offence, so we always start with a careful survey of what’s original and write a heritage statement to go with the application.

Q.04

Q.04

What changes in a conservation area?

Some permitted development rights are removed or reduced, for example for side extensions, cladding and dormers. You also have to give the council six weeks’ notice before working on most trees. It rarely stops a good design, but it does mean the details matter more.

Q.05

Q.05

Is pre-application advice worth paying for?

For new homes, listed buildings and anything unusual, usually yes: it’s a cheap way to find out what the planning officer thinks before you commit. For a straightforward extension it’s often not needed. Councils charge for it, and the fee varies.

Q.06

Q.06

Isn’t planning the same as building regulations?

No. Planning is about whether you can build it and how it looks. Building regulations cover how it’s built: structure, fire safety, insulation, drainage and ventilation. Most extensions need building regulations approval even when they don’t need planning permission.

Q.07

Q.07

What happens if planning is refused?

We read the reasons with you and talk to the officer. Often a revised scheme can be resubmitted, and in England a resubmission of the same type within a year usually carries no council fee. If we think the refusal is wrong, we’ll talk you through an appeal.

Q.08

Q.08

Do I have to tell my neighbours?

The council will write to them when the application goes in, but we always suggest you speak to them first. If the work involves a shared wall or digging near their foundations, the Party Wall Act also applies and you’ll need to serve notice.

A white card model of a small house on a plinth

Start a project

Tell us about the house and what you’d like to change.

We’ll call you back within two working days. The first visit is £250, taken off our fee if you go ahead.

Create a free website with Framer, the website builder loved by startups, designers and agencies.